Client Testimonials

“Our latest sander project, the OTM sander system, has been made a lot easier thanks to the assistance of James Johnson and the team at AEGIS Engineering Systems.
AEGIS have produced a compliance matrix; detailing all of the compliance requirements for the system, and what would be acceptable evidence to demonstrate compliance, on a clause-by-clause basis.
This allows ourselves – as the supplier – the customer – as the safety case holder – and the machine owner – as the ECM – to all agree in advance exactly what needs to be in the engineering change pack and who’s responsibility it is to provide it.
A common failing of modification projects, such as this, is failing to reach this understanding in advance and critical time being wasted to-ing and fro-ing hurriedly trying to assemble missing information at the last minute”.

Mick Milhinch – Engineering Director – AB Hoses & Fittings Ltd

 

Project 160065 – Wessex AHB Conversions – AEGIS – Performance Recognition.

“I write in reference to the above project and would like to inform you that both the Project Manager and the Sponsor have individually mentioned AEGIS for its time and cost-effective delivery of the Risk Reports associated with the ten level crossings involved. In addition, I recognise that AEGIS have shown a great deal of flexibility and patience in its approach a further six projects within the IP Southern Portfolio. The AEGIS deliverables are concise, accurate, thorough and of a good quality being delivered on time. Your efforts contributed substantially to the progression of the projects on Southern and Wales & Western Routes for Network Rail.

On behalf of the route, I would like to extend my heartfelt thanks and appreciation to AEGIS for your outstanding performance and for making the early development works of the portfolio a success”.

Christian Irwin – Signalling Project Director, Capital Delivery, Wales and Western – Network Rail

 

“AEGIS provide us with a great level of service, the team are very professional and can quickly adapt to our ever-changing demands”.

Paul Hargreaves – Technical/Operations Director –  Allan J Hargreaves Plant Engineers Ltd

 

“Wayside Signal Safety Documentation – Well done and a massive thank you for all the hard work and long hours including weekends that you have all put into achieving this important deadline. This is a great example of a cross functional team, focused and planned teamwork delivering for Unipart”.

Paul Blackburn – Product Design and Development Director – Unipart

 

“I’d like to express my sincere thanks and appreciation to Aegis Engineering Systems and the work that they undertake for Petards. They are professional, enthusiastic, communicative and above all flexible when up against some incredibly tight deadlines. As a Project Manager, it means a lot to me when a team is invested and all pulling in the same direction to help to achieve the wider goals”. 

Kerry Lambton – Senior Project Manager – Petards

 

“AEGIS has proven to dg8 design and engineering that it can deliver independent verification work in a timely and cost-effective manner and an excellent working relationship has developed between the two organisations. A key part of this relationship has been the pragmatic application of expertise of the Certification team who are familiar with the verification of engineering changes to existing railway vehicles, many of which were constructed prior to the implementation of current standards”.

Dave Dyche – Business Delivery Manager – dg8 design and engineering 

 

“I just wanted to extend my thanks for working so hard to get the approvals and compliance completed today for the two TPWS projects. This was a significant challenge and I am very grateful and appreciative of your hard work… particularly with working late into the Friday evening. 

Thank you particularly to Luigi, Shamal, Abigail and Tony for your support (and patience..!!) over the past few weeks in getting everything in place”

Craig Payne – Lead Systems Engineer – Mors Smitt

 

“I just wanted to highlight and say thank you for the excellent job Dan, Colin, Chris and Krish have done on the compatibility files and EMC reports for the Class 360s. They’ve delivered everything we needed and kept me informed of progress throughout. They’re a credit to your business” 

Phil Dallman – Class 360 EIS Lead – East Midlands Railway
 

“Thank you very much for this excellent and well put together report and of course for getting it out to us in good time.

The concise conclusion is very brilliant, much appreciated and I am very grateful. We look forward to the formal report next week”

Adeolu Fagbire APM, BEng. MSc. IET – Project Manager – Ilford Heavy Maintenance –  Services UK

 

“Following on from last weeks efforts to close the Class 769 AsBo comments, the Class 769 entered passenger service today.

I would like to thank you all for your efforts and understanding, without which we would not have achieved this significant milestone”.

Trevor Nunn – Safety Manger – Transport for Wales Rail Services